Miles R UsGet the newsletter

Airports

Shenzhen begins Terminal 2 construction and prepares for a new Terminal 1

Shenzhen Bao'an is building a Terminal 2 for 31 million annual passengers while preparing a new Terminal 1 with direct rail connections.

By the Miles R Us editorial team · Jul 2026 · 3 min read

Construction has begun on the main building of Terminal 2 at Shenzhen Bao'an International Airport. Work to prepare the site for a new Terminal 1 on the airport's eastern side also started that day. Terminal 2 will cover 400,000 square meters and have capacity for 31 million passengers annually. It is expected to open during China's 15th Five-Year Plan period, from 2026 to 2030.

Why more space is needed

Shenzhen ranks among China's busiest airports. In 2025, it handled 66.48 million passengers, making it the country's fourth-busiest. Numbers continued rising in 2026, with 28.41 million passengers in the first five months, an increase of 3.64 percent compared with the same months a year earlier.

For now, every passenger flight operates through Terminal 3 and its satellite concourse. The planned terminals are part of a much larger expansion that calls for three runways, three terminal zones, three cargo zones and one satellite concourse. Once the full project is finished, Shenzhen is designed to handle 98 million passengers and 5 million tonnes of cargo and mail each year.

Terminal 2 and rail connections

Terminal 2 is being planned with train connections at the center of its design. Passengers will have access to the Guangzhou-Dongguan-Shenzhen Intercity Railway, Metro Lines 11 and 20, and the Shenzhen-Daya Bay Intercity Railway. An automated people mover will connect Terminal 2 with Terminal 3 and the satellite concourse, making it possible to travel directly between them.

Terminal 1 and faster transfers

The planned Terminal 1 will be next to Airport East Railway Station. Its rail connections will include the Shenzhen-Jiangmen Railway, the proposed second Guangzhou-Shenzhen high-speed railway and several metro lines. The design includes plane-to-train transfers on the same floor, with a target time as short as five minutes.

That could make a real difference in the Pearl River Delta, where trains are often quicker than planes for shorter journeys. Someone arriving on an international long-haul flight could transfer to a high-speed train for another Greater Bay Area city without leaving the terminal building or moving between floors.

What changes for travelers

There is no immediate change to how passengers use the airport. Terminal 3 remains the only passenger terminal, including for international departures and arrivals. Later in the decade, the expansion should bring more gates, less crowding during busy periods and much simpler transfers between flights and trains.

  • Shenzhen is the main hub of Shenzhen Airlines, which belongs to Star Alliance, and an important base for China Southern.
  • The additional terminal capacity will give airlines more room to introduce routes, including long-haul services competing with Hong Kong and Guangzhou.
  • The rail connections could make Shenzhen a useful airport for travel throughout the Greater Bay Area, rather than only Shenzhen itself.

Miles and points

Star Alliance travelers could eventually benefit from more connecting flights through Shenzhen Airlines' home airport as capacity grows. For the moment, though, nothing changes for award bookings or lounge access. Those arrangements remain as they are until the new terminals open and airlines announce which buildings they'll use.

If you're connecting through Shenzhen before the new terminals open, all passenger flights still use Terminal 3. You won't need to change terminals when connecting between domestic and international flights.

What to watch next

The airport hasn't announced a specific opening date beyond the 2026 to 2030 planning period. The next important details will be which airlines move into Terminal 2, how its people mover connects with Terminal 3 and when the first rail services begin operating at the new stations.

Related reading

More news

All news →
Hotels Hyatt and American Airlines are ending their partnership Oct 27, 2026 Elite status United makes it harder to earn Premier 1K status in 2027 Oct 13, 2026 Elite status Southwest changes Companion Pass requirements for 2027 Oct 2026